The old entrance to the ladies shul was closed up with a new doorway being opened further towards the rear of the room. The doorway was bricked up at this position in Engineering Brick to provide support for the steel beam which is to be put in place to support the upper floors when the dividing wall is demolished.
No comments:
Post a Comment